New review
Preview the intake for a first review: project details, requirement documents, and the closeout documents to check.
Project details
Sample only. Changes are temporary.
1. Requirement documents
What the package must contain: specification sections or an owner closeout checklist. Findings cite these.
Upload area (simulated). Real file selection is disabled.
2. Closeout documents to check
O&M manuals, warranties, TAB, startup, training and record drawings.
Upload area (simulated). Real file selection is disabled.